Cables Case Studies

POWER SYSTEM REDESIGN

Interconnect Redesign Reduced Manufacturing Cost by 25%

A leading multinational power system company had to reduce product cost for a 4mW inverter. The system design and manufacturing approach were fundamentally changed from a labor intensive process to a sub-panel fast connect/disconnect design.


 

INDUSTRIAL CONTROL SYSTEMS

Vertical Integration & Supply Chain Expertise Enable 10 Day Delivery

A tier one industrial controls OEM was struggling to meet customer demand for their family of complex electromechanical controls. Sanmina redesigned their global supply chain to consistently achieve a 10 day system delivery.


 

AUTOMOTIVE CAMERA DEMISTER: DESIGNED IN 8 WEEKS

Camera systems are beginning to replace mirrors in automobiles. They need to be demisted & operational in less than a minute. As more and more electronics are used in automobiles, power budgets have become critical design criteria. Sanmina designed an innovative solution.